Hello, everyone. This is HaneulCity Project Manager. This change log contains changes about this project since November 11, 2020. We will notice our change log every quarter, and next notice date is July 1, 2021 but we can change the date because of some reasons.

Website

As we noticed formerly, (Link) we applied some changes via maintenance.

  • Upgrade WordPress to 5.7
  • Upgrade PHP to 8.0 from 7.4
  • Remove bbPress and Forum because we don’t use them more.
  • Security Updates.

Publishing / Map Server

  • [Server] Security Updates
  • [Server] Stopped Github Daily Build publishing
  • [Publish] Publish daily builds to Box Cloud (See Download page)
  • [Server] Update Minecraft Bedrock Edition Dedicated Server
  • [Publish] Github Repository Changed: lego37yoon/haneulcity → haneulcity/haneulcity

Map Changes

Planned Changes

Decided with team members, via conversation. We will apply these changes from next quarter.

  • Rebuild some tunnels (except Line 2, for subway lines) – because new design was decided.
  • Line 3 Redesign / Improvement
    • ‘Mystery Remains’ Station will rebuild, in an underground, add some exits, and some improvements at design.
    • ‘Mountain Village’ Station will move its platform to B3F from B2F.
    • Bridges will replace to tunnels.

And more… for example, we are planning to develop ‘New Town’ (a.k.a New City in South Korea.) in some place. If we decided where to develop, we will upload its changes via ‘Server Areas’ Menu.

‘paperbox’ map changes

At Haneul Town:

  • [From prev quarter] Rebuild Grande Department Store Haneul Town Branch – 100%
  • [From prev quarter] Improve Line 1 platform, tunnel – 100%
  • [From prev quarter] (NEW) Haneul Town Dong-Office – 100%
  • [From prev quarter] (NEW) Haneul Station (Ground) – 95%
    • Rail installation, tunnel construction – 0%
  • Haneul Station (underground) Improve Construction – ?%
    • (NEW) Fast food store – 100%
    • (Rebuild) Haneul Station <> Grande Department Store Elevator Construction – 100%
    • (NEW) Haneul Station Office – 100%
    • (NEW) Haneul Station Exit 1 – 100%

At Forest Town:

  • [From prev quarter] (Rebuild, to underground) Forest Town Station – 100%

At Hayang Town:

  • [From prev quarter] Improvements at some parts between Forest Town Station to Hayang Town Station
  • [Tiny Changes] Hayang Town Station Platform Improvements

At Mountain Village:

  • Remove Line 3 Tunnel for rebuild it – 50%

At Sand City:

  • Confirmed its site
    • University
    • Bus Terminal
    • Office
  • Construction
    • [From prev quarter] Line 3:  Sand Square Station – 95%
    • [From prev quarter] Sand Square – 100%
    • Mizi Dong Dong-office – 1% (Suspended – because Line 3 Tunnel design demo was built on its site and Line 3 Rebuilding is more important than this.)

‘mobilespace2011’ map changes

At Haneul Town:

  • Applied new platform at Haneul Line (via improve previous demo)

At Sand City:

  • Remove Line 3 : Mystery Remains Station for rebuilding – 100%
  • (NEW) Demo for Line 3 Tunnel New Design